InfrastructureGS-3
31 December 2025Cabinet Approves ₹19,142 Crore Nashik-Solapur-Akkalkot Expressway
Syllabus: Infrastructure: Roads and Expressways
Ministry of Road Transport and Highways
Why in news?
CCEA approved the 374 km 6-lane greenfield access-controlled Nashik-Solapur-Akkalkot Corridor in Maharashtra on BOT (Toll) mode.
⚛️Static Concepts
PM Gati Shakti National Master PlanBharatmala PariyojanaPPP Models in Infrastructure
📌
Prelims-Oriented Points
- Project length: 374 km; Total capital cost: ₹19,142 crore.
- Mode: BOT (Toll) – Build-Operate-Transfer with toll collection.
- Connection: Links Delhi-Mumbai Expressway, Samruddhi Mahamarg, and west-east coast connectivity.
- Travel time reduction: From 31 hours to approximately 17 hours (45% reduction).
- Districts connected: Nashik, Ahilyanagar, Dharashiv, and Solapur.
⚠️
Examiner's Trap: This is a GREENFIELD expressway (new construction) – not an upgrade of existing highway.
Quick Data Points
Length: 374 km
Cost: ₹19,142 crore
Travel Time Saving: ~45%
Employment (Direct): 251.06 lakh man-days
Mains Value Addition
GS-3: Infrastructure Planning; PM Gati Shakti.- Integrated Planning: Project aligns with PM Gati Shakti National Master Plan for multimodal connectivity.
- Industrial Corridors: Improves logistics for NICDC nodes at Kopparthy and Orvakal.
- Regional Development: Enhanced connectivity for backward districts of Maharashtra.
🔍
Strategy Deep Dive
→Mission 100% Electrification & Green Railways
Daily MCQ Session
Challenge yourself with the 2025-12-31 quiz
Solve Now
Up Next: Daily Brief
PLI Auto Scheme: ₹35,657 Crore Investment Achieved
📑 Economy⏱️ 2 min read
→